RLB-Tube phase 3b

KT Verdus Industrial Water Treatment

(0) Rate:

Real-world walkthrough of a KT Verdus deployment at a mall - chemical-free treatment of cooling-tower blowdown water into industrial-grade fresh water.

Details
loading…
Transcript
Open to load the transcript.

Comments

Sign in to comment.